WhatsAPP:
+8618790675017
Home > News
Main Products
On-rail Transfer trolleys
Custom Transfer trolleys
Trackless Transfer trolleys
Industrial Trailers
Rail Flaw Detection Vehicle

Need Help?

or Email us:

sale@perfte.com

Follow Us

Facebook Linkedin

In-plant logistics handling turnover equipment

2018-09-03

 In-plant logistics handling turnover equipment

1. Tools: Track over-span and crane.
2. Requirements:
A. Check the reliability of the handling facilities, such as wheels, before use.
B. The raw materials handled must not be overloaded.
C. It must be run within the specified channel line during handling.
     two. Parts, semi-finished products turnover
1. Tools: assembly parts and semi-finished products turnover turnover cart
2. Claim:
A. The parts are processed and finished every day, and the semi-finished products must be transferred to the next order in time.
B. The gray box stacking is not allowed to exceed five layers when transported by the truck, and the iron turnover box gray box green box stacking is not allowed to exceed five layers. The turnover of the blue (white) box of the turnover car is not allowed to exceed six layers when transported by the turnover car.
C. When using a working transfer car, one person cannot use more than two working transfer cars at the same time.
E. It must be run within the channel line during the turnaround.
In-plant logistics handling turnover equipment

Service Net Video [ Contact ]    [ New Products ]          

Copyright © 2016 Henan Perfect Handling Equipment Co., Ltd. All rights reserved.Site Index Product Index